iisgtwyp.wi.gov - /ftp/dtsd/sw-region/US 12 Baraboo Public Record Request/


[To Parent Directory]

8/29/2017 10:30 AM 4578163 2-6-13 PIM Presentation.pdf
8/29/2017 10:35 AM 62464 Aesthetics on US 12 Bypass Structures (South Section).msg
8/29/2017 10:30 AM 36063108 August222017CSSOpenRecordsRequestDocumentation.pdf
8/29/2017 10:35 AM 49152 Contacting the Town of Baraboo.msg
8/29/2017 10:35 AM 1130496 Details.msg
8/29/2017 10:35 AM 3774464 DRAFT Presentation for 8 1 meeting.msg
8/29/2017 10:35 AM 1458176 Final Confirmation of US 12 Structures Aesthetics.msg
8/29/2017 10:35 AM 64000 Formliner for US 12 structures.msg
8/29/2017 10:35 AM 1292800 Formliners for US 12 structures.msg
8/29/2017 10:35 AM 63488 FW Architectural Surface Treatment.msg
8/29/2017 10:35 AM 69632 FW Epoxy Coated Aggregate US 12 North Section SPV.msg
8/29/2017 10:35 AM 80384 FW Final Confirmation of US 12 Structures Aesthetics.msg
8/29/2017 10:35 AM 1887232 FW Formliners for US 12 structures (53).msg
8/29/2017 10:35 AM 69632 FW Formliners for US 12 structures.msg
8/29/2017 10:30 AM 432128 FW Public Records Request 1674-00-81 1674-00-84 Highway 12 Baraboo bypass.msg
8/29/2017 10:35 AM 168448 FW Redi Rock Retaining Wall.msg
8/29/2017 10:35 AM 39936 FW Status of Aesthetics Decisions on US 12 Bypass Structures (South Section).msg
8/29/2017 10:35 AM 6234624 FW Structures Coordination - US 12.msg
8/29/2017 10:35 AM 1539072 FW US 12 CSD Meeting #2 Follow-up Coordination.msg
8/29/2017 10:35 AM 125440 FW US 12 South Section Additional Design Decisions.msg
8/29/2017 10:35 AM 1387520 FW US 12 South Section Bypass - CSD.msg
8/29/2017 10:35 AM 1307136 FW US 12 South Section Updated Bridge Elevations (14).msg
8/29/2017 10:35 AM 3302400 FW US 12 South Section Updated Bridge Elevations (19).msg
8/29/2017 10:35 AM 1316352 FW US 12 South Section Updated Bridge Elevations.msg
8/29/2017 10:35 AM 71680 RE 1st CSD Mtg w local officials - Availability.msg
8/29/2017 10:35 AM 47616 RE Aesthetic costs.msg
8/29/2017 10:35 AM 1166336 RE Architectural Surface Treatment.msg
8/29/2017 10:35 AM 4350464 RE DRAFT Presentation for 8 1 meeting (57).msg
8/29/2017 10:35 AM 88064 RE DRAFT Presentation for 8 1 meeting.msg
8/29/2017 10:35 AM 99328 RE Final Confirmation of US 12 Structures Aesthetics (4).msg
8/29/2017 10:35 AM 99840 RE Final Confirmation of US 12 Structures Aesthetics.msg
8/29/2017 10:35 AM 68608 RE Formliner for US 12 structures.msg
8/29/2017 10:35 AM 78336 RE Formliners for US 12 structures (51).msg
8/29/2017 10:35 AM 81920 RE Formliners for US 12 structures.msg
8/29/2017 10:35 AM 60416 RE Slope paving for South Baraboo Bypass (50).msg
8/29/2017 10:35 AM 59904 RE Slope paving for South Baraboo Bypass.msg
8/29/2017 10:35 AM 40960 RE South Baraboo Bypass stake holder meeting.msg
8/29/2017 10:35 AM 38912 RE South Baraboo Bypass.msg
8/29/2017 10:35 AM 5734912 RE South Gasser Road Bridge Aesthetics (25).msg
8/29/2017 10:35 AM 94720 RE South Gasser Road Bridge Aesthetics (26).msg
8/29/2017 10:35 AM 2275840 RE South Gasser Road Bridge Aesthetics (27).msg
8/29/2017 10:35 AM 73216 RE South Gasser Road Bridge Aesthetics (31).msg
8/29/2017 10:35 AM 106496 RE South Gasser Road Bridge Aesthetics.msg
8/29/2017 10:35 AM 231936 RE South Section US 12 Bypass - Structure Design and Deadline for CSD Features on Structures (58).msg
8/29/2017 10:35 AM 63488 RE South Section US 12 Bypass - Structure Design and Deadline for CSD Features on Structures (59).msg
8/29/2017 10:35 AM 55296 RE South Section US 12 Bypass - Structure Design and Deadline for CSD Features on Structures.msg
8/29/2017 10:35 AM 6224896 RE Structures Coordination - US 12 (1).msg
8/29/2017 10:35 AM 67584 RE Structures Coordination - US 12 (2).msg
8/29/2017 10:35 AM 73216 RE Structures Coordination - US 12 (3).msg
8/29/2017 10:35 AM 101376 RE Structures Coordination - US 12.msg
8/29/2017 10:35 AM 80384 RE Summary of Conference Call.msg
8/29/2017 10:35 AM 71168 RE Unit Price for Anti-Graffiti Coating (52).msg
8/29/2017 10:35 AM 56320 RE Unit Price for Anti-Graffiti Coating (54).msg
8/29/2017 10:35 AM 79872 RE Unit Price for Anti-Graffiti Coating.msg
8/29/2017 10:35 AM 68608 RE US 12 Bypass South Section CSD Budget and Policy.msg
8/29/2017 10:35 AM 104960 RE US 12 CSD Kick-off Meeting Follow up (55).msg
8/29/2017 10:35 AM 55808 RE US 12 CSD Kick-off Meeting Follow up (56).msg
8/29/2017 10:35 AM 183808 RE US 12 CSD Kick-off Meeting Follow up.msg
8/29/2017 10:35 AM 50688 RE US 12 CSD Kick-off Meeting Minutes (Draft).msg
8/29/2017 10:35 AM 81408 RE US 12 CSD Meeting #2 Follow-up & Coordination.msg
8/29/2017 10:35 AM 108032 RE US 12 CSD Meeting #2 Follow-up Coordination (28).msg
8/29/2017 10:35 AM 125440 RE US 12 CSD Meeting #2 Follow-up Coordination (29).msg
8/29/2017 10:35 AM 118784 RE US 12 CSD Meeting #2 Follow-up Coordination (30).msg
8/29/2017 10:35 AM 95744 RE US 12 CSD Meeting #2 Follow-up Coordination (32).msg
8/29/2017 10:35 AM 118272 RE US 12 CSD Meeting #2 Follow-up Coordination.msg
8/29/2017 10:35 AM 742912 RE US 12 CSD Mtg #2 Presentation (33).msg
8/29/2017 10:35 AM 714240 RE US 12 CSD Mtg #2 Presentation (34).msg
8/29/2017 10:35 AM 137216 RE US 12 CSD Mtg #2 Presentation (35).msg
8/29/2017 10:35 AM 104448 RE US 12 CSD Mtg #2 Presentation (36).msg
8/29/2017 10:35 AM 92160 RE US 12 CSD Mtg #2 Presentation (37).msg
8/29/2017 10:35 AM 60416 RE US 12 CSD Mtg #2 Presentation (38).msg
8/29/2017 10:35 AM 48640 RE US 12 CSD Mtg #2 Presentation (39).msg
8/29/2017 10:35 AM 98816 RE US 12 CSD Mtg #2 Presentation (40).msg
8/29/2017 10:35 AM 81920 RE US 12 CSD Mtg #2 Presentation (41).msg
8/29/2017 10:35 AM 180224 RE US 12 CSD Mtg #2 Presentation.msg
8/29/2017 10:35 AM 102400 RE US 12 South Section Additional Design Decisions (10).msg
8/29/2017 10:35 AM 167936 RE US 12 South Section Additional Design Decisions (11).msg
8/29/2017 10:35 AM 90112 RE US 12 South Section Additional Design Decisions (12).msg
8/29/2017 10:35 AM 90112 RE US 12 South Section Additional Design Decisions (13).msg
8/29/2017 10:35 AM 121344 RE US 12 South Section Additional Design Decisions (5).msg
8/29/2017 10:35 AM 113152 RE US 12 South Section Additional Design Decisions (6).msg
8/29/2017 10:35 AM 129536 RE US 12 South Section Additional Design Decisions.msg
8/29/2017 10:35 AM 275968 RE US 12 South Section Bypass - CSD (42).msg
8/29/2017 10:35 AM 326656 RE US 12 South Section Bypass - CSD (43).msg
8/29/2017 10:35 AM 108032 RE US 12 South Section Bypass - CSD (44).msg
8/29/2017 10:35 AM 129024 RE US 12 South Section Bypass - CSD (45).msg
8/29/2017 10:35 AM 120832 RE US 12 South Section Bypass - CSD (46).msg
8/29/2017 10:35 AM 1479168 RE US 12 South Section Bypass - CSD (47).msg
8/29/2017 10:35 AM 117248 RE US 12 South Section Bypass - CSD.msg
8/29/2017 10:35 AM 71168 RE US 12 South Section Formliner for WIS 136 Structure.msg
8/29/2017 10:35 AM 84480 RE US 12 South Section MSE Walls (20).msg
8/29/2017 10:35 AM 84480 RE US 12 South Section MSE Walls.msg
8/29/2017 10:35 AM 55808 RE US 12 South Section Railings (49).msg
8/29/2017 10:35 AM 56832 RE US 12 South Section Railings.msg
8/29/2017 10:35 AM 2053120 RE US 12 South Section Revised Structures (21).msg
8/29/2017 10:35 AM 2029056 RE US 12 South Section Revised Structures (22).msg
8/29/2017 10:35 AM 69632 RE US 12 South Section Revised Structures (23).msg
8/29/2017 10:35 AM 60928 RE US 12 South Section Revised Structures (24).msg
8/29/2017 10:35 AM 2065408 RE US 12 South Section Revised Structures.msg
8/29/2017 10:35 AM 154112 RE US 12 South Section Updated Bridge Elevations (15).msg
8/29/2017 10:35 AM 104448 RE US 12 South Section Updated Bridge Elevations (16).msg
8/29/2017 10:35 AM 75776 RE US 12 South Section Updated Bridge Elevations (17).msg
8/29/2017 10:35 AM 76288 RE US 12 South Section Updated Bridge Elevations (18).msg
8/29/2017 10:35 AM 133120 RE US 12 South Section Updated Bridge Elevations (7).msg
8/29/2017 10:35 AM 126976 RE US 12 South Section Updated Bridge Elevations (8).msg
8/29/2017 10:35 AM 169984 RE US 12 South Section Updated Bridge Elevations (9).msg
8/29/2017 10:35 AM 138752 RE US 12 South Section Updated Bridge Elevations.msg
8/29/2017 10:35 AM 1698816 RE US 12 South Segment Loose Ends for CSD Meeting.msg
8/29/2017 10:35 AM 78336 RE US 12 Updated CSD Costs (48).msg
8/29/2017 10:35 AM 77824 RE US 12 Updated CSD Costs.msg
8/29/2017 10:35 AM 53248 RE USH 12 Epoxy slope paving.msg
8/29/2017 10:30 AM 87878 RE_ Record of Decision - US 12 colors and patterns.pdf
8/29/2017 10:35 AM 56320 Slope paving for South Baraboo Bypass.msg
8/29/2017 10:35 AM 61440 South Baraboo Bypass Profiles.msg
8/29/2017 10:35 AM 3339264 South Gasser Road Bridge Aesthetics.msg
8/29/2017 10:35 AM 53248 South Section US 12 Bypass - Structure Design and Deadline for CSD Features on Structures.msg
8/29/2017 10:35 AM 1847296 Structures plans for Broadway Bridge.msg
8/29/2017 10:35 AM 75776 Summary of Conference Call.msg
8/29/2017 10:35 AM 328192 US 12 Bypass South Section CSD Budget and Policy.msg
8/29/2017 10:35 AM 83456 US 12 CSD Kick-off Meeting Minutes (Draft).msg
8/29/2017 10:35 AM 79872 US 12 CSD Meeting #1 Minutes.msg
8/29/2017 10:35 AM 78848 US 12 CSD Meeting #2 Follow-up Coordination.msg
8/29/2017 10:35 AM 96256 US 12 CSD Meeting #2.msg
8/29/2017 10:35 AM 4168704 US 12 CSD Mtg #2 Presentation.msg
8/29/2017 10:35 AM 3656192 US 12 CSD Presentation - v2.msg
8/29/2017 10:35 AM 86016 US 12 South Section Additional Design Decisions.msg
8/29/2017 10:35 AM 3743744 US 12 South Section Conference Call Today.msg
8/29/2017 10:35 AM 1439232 US 12 South Section MSE Walls.msg
8/29/2017 10:35 AM 47104 US 12 South Section Railings.msg
8/29/2017 10:35 AM 1969152 US 12 South Section Revised Structures.msg
8/29/2017 10:35 AM 2057216 US 12 South Section Updated Bridge Elevations.msg
8/29/2017 10:35 AM 79872 US 12 South Seg CSD Budget.msg
8/29/2017 10:35 AM 140288 US 12 South Segment Bypass Stakeholder Meeting Reminder.msg
8/29/2017 10:35 AM 56320 US 12 South Segment Loose Ends for CSD Meeting.msg
8/29/2017 10:35 AM 1780736 US 12 Structures CAD file.msg
8/29/2017 10:35 AM 82944 US 12 Updated CSD Costs.msg
8/29/2017 10:35 AM 1926656 USH 12 CSD Stakeholder Meeting #2 Minutes.msg
8/29/2017 10:30 AM 1568810 USH-12_SaukCounty_061114_1674-00-02-23-80-81-82_Sauk-Co.pdf