iisgtwyp.wi.gov - /ftp/dtsd/se-region/se-pds/WWB/cadd/phase 2/27880071/
[To Parent Directory]
6/28/2022 12:27 PM <dir> 10_Proposed Cross Sections (SOE)
6/28/2022 12:27 PM <dir> 11_Proposed Surfaces (dtm)
6/28/2022 12:27 PM <dir> 12_Proposed Sufaces (xml)
6/28/2022 12:28 PM <dir> 13_Graphical Data - Reference Files
6/28/2022 12:29 PM <dir> 14_Graphical Data - Plan Sheets
6/28/2022 12:26 PM <dir> 1_Field Control Data
6/28/2022 12:26 PM <dir> 2_Existing Surface
6/28/2022 12:26 PM <dir> 3_Existing Topography-General
6/28/2022 12:26 PM <dir> 4_Existing Topography-Utilities
6/28/2022 12:26 PM <dir> 5_Reference Alignments
6/28/2022 12:26 PM <dir> 5a_Alignment Reports
6/27/2022 11:24 AM <dir> 6_Reference Profiles
6/28/2022 12:26 PM <dir> 7_Superelevation Data
6/28/2022 12:26 PM <dir> 8_Right-of-Way
6/27/2022 11:24 AM <dir> 9_Slope Staking
4/2/2019 3:16 AM 54350 BL_MetaData_27880071.docx
4/2/2019 3:16 AM 39595 HN_MetaData_27880071_20180822.docx
6/28/2022 12:29 PM <dir> old
4/2/2019 3:16 AM 914391 RE_ DDE for Project 2788-00-71 US-18, Waukesha Bypass, Genessee Road to Fiddlers Creek Drive, Waukesha Co..pdf