Horizontal-Vertical Control/Topographic-DTM/Utility/Structure surveys along EB STH 100 (Ryan Road) including B-40-053 Project ID:2040-20-00 WCCS, Milwaukee County, NAD83(2011), NAVD88(2012), GEOID12A, US SURVEY FOOT GRAEF 20160500.08 5000 Date of Survey, June/July 2019 PT#,North,East,Elevation,Description 16450,237298.276,610870.06,681.498,CP F1000 BERNSTEN SPK W/ALUIM CAP 17070,237191.082,611485.325,683.132,CP F1000 BERNSTEN SPK W/ALUIM CAP 17142,237318.686,611614.207,699.315,BM ALUIM DISK TOP WALL NE COR OF BRIDGE B-40-633 17162,237342.118,611585.245,680.608,CP F1000 BERNSTEN SPK W/ALUIM CAP 17472,237171.717,611886.719,691.408,BM ALUIM DISK TOP WALL SW COR OF BRIDGE C-40-79 17832,237237.707,612250.574,684.479,CP F1000 BERNSTEN SPK W/ALUIM CAP 16813,237284.653,611233.239,691.007,CP CHSLED X W EDGE OF INLET 230' +/- W OF UP RR BRIDGE 17048,237220.034,611464.436,698.649,BM ALUM CAP SW CORNER B40-530-84 UNION PACIFIC RAILROAD BRIDGE 17501,237165.154,611915.075,681.793,BM CHSLD SQ ON CONCRETE BIKE TRAIL BENCH S SIDE RYAN RD AT BOX CULVERT C-40-79 18642,237298.809,613065.530,663.723,CP CHSLD + W CULVERT NE QUAD OF PENNSYLVANIA - RYAN