Slopestake Report Wisconsin DOT Report Created by,Customer Created on,1/9/2017 Surface: 48323_CDR Slope Flattening1 RT - Datum Alignment: STH 13 As-Built Start Station = 37+00(1) End Station = 605+43.9(7) Sample Line Group = Slope Flatten-1 Station Offset Plan Elev Field Elev C/F Point Type Slope 482+75(5) 23.91 607.90 -25.00% 43.59 602.98 ============================================================================= 483+00(5) 24.23 607.93 -25.00% 40.70 603.81 ============================================================================= 483+23.74(5) 24.53 607.96 -25.00% 36.79 604.89 -33.33% 43.52 602.65 ============================================================================= 483+50(5) 24.86 607.91 -25.00% 37.11 604.85 25.00% 38.00 605.07 =============================================================================