Slopestake Report Wisconsin DOT Report Created by,Customer Created on,1/9/2017 Surface: 41954_CDR Slope Flattening1 - Datum Alignment: STH 13 As-Built Start Station = 37+00(1) End Station = 605+43.9(7) Sample Line Group = Slope Flatten XS Station Offset Plan Elev Field Elev C/F Point Type Slope 419+00(3) 19.82 680.90 -25.00% 30.00 678.35 -33.33% 32.05 677.67 ============================================================================= 419+20(3) 19.84 680.83 -25.00% 30.00 678.29 -33.33% 37.62 675.75 ============================================================================= 419+40(3) 20.04 680.78 -25.00% 30.00 678.28 -33.33% 39.53 675.11 ============================================================================= 419+54(3) 20.19 680.74 -25.00% 30.00 678.29 -33.33% 40.49 674.79 ============================================================================= 419+60(3) 20.00 680.75 -25.00% 30.00 678.25 -33.33% 39.53 675.07 ============================================================================= 419+80(3) 19.50 680.76 -25.00% 30.00 678.13 -33.33% 35.29 676.37 =============================================================================